
Resources
Spec guides, decision frameworks, and field references.
Written for architects, specifiers, and general contractors — the questions that come up before, during, and after a commercial flooring spec gets issued for bid.
System Selection
3 articles
System Selection
Epoxy vs. Cementitious Terrazzo: Picking the Right System
Side-by-side comparison of epoxy and cementitious terrazzo across thickness, cure, breathability, exterior use, and repairability — with the project conditions that should drive the call.
System Selection
Terrazzo vs. Polished Concrete: A Specifier's Decision Framework
How terrazzo and polished concrete differ in design control, lifecycle, repairability, and total installed cost — and when the project should drive each choice.
System Selection
When to Specify Precast Terrazzo Instead of Field-Cast
Six project conditions where precast terrazzo outperforms a field pour on quality, schedule, or constructability — with a checklist for which scopes to break out as precast.
Specification
3 articles
Specification
The NTMA Spec Checklist: What Belongs in Section 09 66 23
A field-tested checklist for writing complete terrazzo specifications — system type, divider strips, aggregate, performance tests, submittals, and the references that prevent bid-day ambiguity.
Specification
Divider Strip Selection: Material, Gauge, and Layout
How to pick the right divider strip metal, gauge, and depth for your terrazzo project — and the layout principles that prevent random cracking and make the floor read as designed.
Specification
Terrazzo Aggregate Selection: Marble, Glass, and Specialty Chips
A working reference for selecting terrazzo aggregate — marble varieties, recycled glass, mother-of-pearl, granite, and metal — with sizing, sourcing, and cost considerations.
Compliance
2 articles
Compliance
Slip Resistance and ADA Compliance for Terrazzo Floors
The current ANSI A326.3 DCOF standard, ADA accessibility requirements, and how to specify and finish a terrazzo floor that meets both — including wet zone, ramp, and stair-nosing detail.
Compliance
How Terrazzo Contributes to LEED and WELL Certification
The specific LEED v4.1 and WELL v2 credits terrazzo systems support — MR, IEQ, and lifecycle — plus the submittal documentation needed to claim each credit.
Project Planning
2 articles
Project Planning
Planning a Terrazzo Install: Schedule, Sequencing, and Critical-Path Risk
A working schedule template for terrazzo on a commercial project — submittal lead times, substrate prep windows, pour sequencing, grind/polish phases, and the trades that must finish before mobilization.
Project Planning
Restoration vs. Replacement: When to Save the Existing Terrazzo
How to assess an aging terrazzo floor — what damage is cosmetic vs structural, when restoration outperforms replacement, and the typical cost split between the two paths.
Question not covered here?
We answer architect and GC questions all day. Send the project condition and we'll respond with the appropriate spec path.
Ask Our Team